Type into blank cells, then use your browser’s Print function to print or save a completed copy. Browser edits are temporary; save or print before closing. Use one record per inspection area or hold point and attach full logs and raw results.
Identification and inspection basis
Record ID
Asset ID
Drawing / revision
Component / zone
Datum / orientation
Grid / elevation
Inspection date / time
Inspector / witness
Specification / revision
ITP / hold point
Method / edition
Acceptance criteria / clause
Product / batch / coat
Evidence and coverage
Surface preparation / results
Climate log reference
Instrument ID
Verification / adjustment reference
Sampling area / extent
Raw results / units
Photo / data references
Defect / NCR / repair ID
Excluded / inaccessible area and reason
Disposition and release
Status / open action
Release authority / date
Reinspection reference
Keep the original result and link corrections, NCRs and approved concessions. A release decision belongs to the authority named in the ITP. Mark unperformed checks as not applicable, not inspected or incomplete with the reason. No supplier or project approval is implied. Prepared 4 November 2026. Read the checklist and its limits.