JASO elevator repair and retrofit — photo 2

Wind Turbine Service Lift Repair and Retrofit

Repair and retrofit of service lifts on operating wind turbines. Share the lift make and model, the number of turbines and recent inspection findings, and we will discuss a scope based on our JASO service lift work on 41 turbines.

Service Lift Repair and Retrofit for Operating Wind Turbines

A service lift, also called a tower lift or wind turbine elevator, carries technicians and tools up the tower. When it is out of service, every visit means a long ladder climb, and maintenance slows down across the wind farm.

Gridinta repairs and retrofits wind turbine service lifts on operating turbines. Our published evidence is two JASO elevator system campaigns covering 41 turbines in Finland and Latvia. The scope combined lift system repair, retrofit work and ladder alignment, and in Finland it also included validation inspections.

Our IRATA rope access technicians already carry out inspection, maintenance and repair on onshore wind turbines. Lift work fits into the same planning: turbine availability, site induction, access, rescue arrangements and a clear record of what was done.

JASO elevator repair and retrofit — photo 4

What the Work Can Include

Every lift campaign is scoped against the lift manufacturer's documentation, the operator's requirements and the site rules. Based on the JASO work, a scope can include:

  • Repair of service lift system faults and worn components found during inspection or reported by site teams
  • Retrofit work defined by the operator, the lift manufacturer or a safety notice, delivered turbine by turbine
  • Ladder alignment so that the tower ladder and the lift system work together as one access route
  • Validation checks after the work, so each lift is handed back in the condition agreed in the scope
  • Work records with completed actions, photographs and any open points for the operator

We discuss lift makes and models other than JASO case by case. Tell us what is installed and what the latest inspection found.

Evidence from Finland and Latvia

The figures below come from our published JASO case study. They describe these two projects only, not company-wide totals.

JASO service lift campaigns
CampaignCountryTurbinesScope as published
Project 1Finland25JASO elevator system repair, retrofit, ladder alignment and validation inspections
Project 2Latvia16JASO elevator system repair, retrofit and ladder alignment
TotalFinland and Latvia41Two separate wind farm campaigns inside operating turbine towers

Delivering the same scope consistently across dozens of turbines was the main challenge. Each turbine followed the same sequence: assess the condition, repair or retrofit, align the ladder system and verify the access setup for use.

JASO elevator repair and retrofit — photo 1

Why Wind Turbine Service Lifts Need Attention

Turbine lifts work in a tall, narrow tower with vibration, temperature swings and frequent use by different crews. Until recently, there was no European standard written for them. EN 81-44:2024, Safety rules for the construction and installation of lifts, Part 44: Lifting appliances in wind turbines, was approved by CEN on 30 June 2024. It covers permanently installed, guided lifting appliances driven by rack and pinion or rope traction, including rescue and evacuation. It does not apply to appliances manufactured before its publication, so much of the installed fleet was built to earlier designs.

The UK Health and Safety Executive issued safety bulletin ED01-2024 on service lifts in offshore and onshore turbines in May 2024. A technician suffered serious hand injuries when his hand was trapped between fixed and moving parts while he used the external controls to send the lift down. HSE asked operators to check gate design, guarding and control positions at once, and to reposition controls or add guarding where needed. Findings like these often lead to retrofit work on existing lifts.

Asbestos Brake Pad Alerts in Australia

On 19 December 2025, SafeWork NSW in Australia published an alert on asbestos in brake pads used in wind turbines. It says the pads are used in service lift motors, material hoists, and yaw and rotor brakes. The equipment was imported, and asbestos was found in pads from more than one manufacturer. The alert tells operators to assume all brake pads, including spare parts, contain asbestos until proven otherwise. It also tells them to stop work on lifts with such pads until a competent person has inspected them.

Workplace Health and Safety Queensland followed with its own alert on brake pads used in windfarms on 23 January 2026. Both are Australian alerts and they do not state that European fleets are affected. Operators elsewhere can still ask their lift manufacturer for a material declaration for brake pads and spare parts before planning brake work.

JASO elevator repair and retrofit — photo 3

Inspections, Repairs and Who Signs Off

Periodic examination of a turbine lift is a legal duty for the operator. The examiner depends on the country. In Great Britain, lifting equipment for people needs a thorough examination by a competent person at least every six months or under an examination scheme. In Germany, lift installations need inspections by an approved inspection body (ZÜS).

Gridinta is not an inspection body. We repair and retrofit lift systems, carry out validation checks agreed in the work scope and document the result, so the examiner the operator appoints can complete the statutory examination. Our guide to what a wind turbine service lift inspection covers explains the intervals and checks in more detail.

Planning a Service Lift Repair or Retrofit Scope

To prepare a practical quotation, share the site location, turbine make and model, lift make and model, the number of turbines, recent inspection or examination reports, fault descriptions and photographs, any manufacturer safety notices, the requested work window, shutdown availability and site induction requirements.

Typical deliverables can include a turbine-by-turbine work record, photographs, completed actions and recommendations for follow-up. Agree the deliverables and acceptance criteria before mobilisation.

Related services include onshore wind farm maintenance, industrial rope access services, electrical services at height and industrial welding and fitting. If a retrofit changes how a lift works, read our note on when the EU Machinery Regulation makes you the manufacturer.

Wind Turbine Service Lift Repair: FAQ

What service lift work does Gridinta carry out on wind turbines?
Our published service lift work is the repair and retrofit of JASO elevator systems, together with ladder alignment, on 41 operating wind turbines in Finland and Latvia. In the Finnish campaign the scope also included validation inspections. We discuss other lift makes and models case by case.
Where has Gridinta repaired wind turbine service lifts?
The published JASO campaigns covered 25 wind turbines in Finland and 16 in Latvia. Gridinta is based in Klaipėda, Lithuania, and discusses projects in other countries on request.
Is Gridinta a lift inspection body?
No. Statutory examinations, such as a LOLER thorough examination in Great Britain or a ZÜS inspection in Germany, are carried out by the competent person or approved inspection body the operator appoints. Gridinta repairs and retrofits lift systems and can carry out validation checks agreed in the work scope.
What is EN 81-44?
EN 81-44:2024 is the European standard for lifting appliances permanently installed in wind turbines. It covers guided lifts driven by rack and pinion or rope traction, including rescue and evacuation. It does not apply to lifting appliances manufactured before its publication in 2024.
Do the Australian asbestos brake pad alerts affect European wind turbine lifts?
The alerts from SafeWork NSW in December 2025 and Workplace Health and Safety Queensland in January 2026 concern equipment in Australia. They do not state that European fleets are affected. Owners elsewhere can ask their lift manufacturer for a material declaration for brake pads and spare parts.
What information helps you quote a service lift repair or retrofit?
Send the site location, turbine make and model, lift make and model, number of turbines, recent inspection or examination reports, fault descriptions and photographs, any manufacturer safety notices, the requested work window and site induction requirements.
Can you combine service lift work with other work in the tower?
Yes. In the JASO campaigns, ladder alignment was delivered alongside the lift repair and retrofit work. Other tower work, such as rope access inspection, electrical work at height or welding and fitting, can be planned into the same mobilisation where the scope and site rules allow.